Case studies

PARTNERING
WITH PURPOSE

From skyscrapers to shop fronts, whether it’s cleaning and maintenance, installation and access solutions, or compliance management, Sky5 has the resources, experience, and expertise to deliver the best bespoke solutions to suit your building, your business, and your budget.

8 Chifley Square

SYDNEY CBD
01/08/2014 – 03/08/2014

Sky5 were engaged by Mirvac to conduct a comprehensive building clean of the newly completed 8 Chifley Square, CBD, Sydney.

34

BUILDING
LEVELS

145m

BUILDING
HEIGHT

20

NUMBER
OF HOURS

8 Chifley Square

THE CLEAN NEEDED TO BE COMPLETED WITHIN 20 HOURS OF THE BUILDING’S GRAND OPENING NIGHT CELEBRATIONS.

Challenges

  • Necessary approvals and strict completion requirements due to upcoming event.
  • Extensive planning required; Elevated Work Platform hire, shift work hours and safety management planning.
  • Short notice and a tight deadline for the 30+ storey building.
  • Complex anchorage system for rope access technicians, who were necessary to engage for the clean to be completed.
  • Internal foyer track system needing rescue standby personnel.
  • Without previous work completed on the property by the company, rigorous Work Health and Safety procedures were required.

Solutions

  • We utilised our highly trained supervisors and team members to conduct the cleaning, management and planning.
  • During all suspended works, a standby rescue team were on hand, lead by one of our level 3 rope access technicians.
  • We liaised with client to overcome time restraints required work hours by working in multiple shifts spread across our team.
  • Without anchorage, a compliant rigging system was devised and implemented by one of our level 3 rope access technicians.
  • All of the required Work Health and Safety documentation, site plans, Safe Work Method Statements, and permits were facilitated.
  • The opening night attendee’s comprised of both Mirvac and Government representatives, as such; we ensured complete customer assurance and satisfaction at the completion of works.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“The work at 8 Chifley Square required thorough Work Health and Safety, rigging and rescue planning. As the project presented a multitude of challenges, our company group is proud of our achievement that allowed the entire building and impressive foyer to gleam on the building’s grand opening night. The results of which enabled Mirvac to sign an ongoing contract with our window cleaning division, ensuring the same impressive results with the same dedication to service.”

Zig Zag Towers

WEST BAY LAGOON, QATAR
01/08/2014 – 19/08/2014

With the existing building maintenance systems inoperable, the Sky5 team was contracted to provide an access and cleaning solution due to the complex nature of the building design.

3000m

Lengths
of Rope

18 DAYS

To complete
project

1440

Number
of hours

Zig-Zag Towers

ZIG-ZAG TOWERS OR THE ‘DANCING TOWERS’ DUE TO THEIR WAVE-LIKE CHARACTER, ARE THE TALLEST AND HIGHEST LEANING TWIN TOWERS IN THE WORLD.

Challenges

  • 140m vertical sections, spanning upwards with complex façade and intricate glazing panel design.
  • Our work teams had to scale up and down in size frequently.
  • Extreme environmental working conditions – heat, dust storms and swirling winds.
  • High-level and comprehensive equipment inventory requirements.
  • Actual condition of façade after years of degradation VS clients expectations.
  • Without previous work completed on the property by the company, rigorous Work Health and Safety procedures were required.

Solutions

  • Supply team size of 14 technicians – 2 Safety Co-ordinators – standby rescue and Rigging crews.
  • Hand held anemometer assessing weather conditions every hour to gauge weather conditions.
  • Specialised and custom access equipment supplied and installed to handle the access challenges of the project.
  • Two stage façade washing with initial and final clean proving the optimum option to meet client expectations.
  • Means and methods of maintenance rehearsed to ensure teams work in horizontal formation.
  • Working times commenced at sunset to avoid extreme climate conditions.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“The Sky5 team delivered the project on time and within budget, taking just over 18 days to complete both towers external requirements. Client expectations were exceeded and the teams enjoying a well deserved break upon completion.”

Bay Centre

PYRMONT
01/08/2014 – 03/08/2014

Sky5, was contracted by Mirvac Real Estate, to conduct remedial repairs to the structural steel elements of the northern façade.

240

NUMBER
OF HOURS

120 L

OF COATING
APPLIED

190

COMPONENTS
INSTALLED

THE WORKS REQUIRED QUALIFIED PAINTING AND PRODUCT APPLICATION COMPETENCY VIA ROPE ACCESS.

Challenges

  • High profile client and property.
  • High risk works above major public areas.
  • Condition of the existing steelwork.
  • High-level technical requirements to underwrite warranties.
  • Material application process parameters.
  • Safeguarding stakeholders work site safety standards.

Solutions

  • Trade qualified rope access technicians – operating under Licence 230913C.
  • Our Dulux Accreditation – substantiates 10year warranty on paintworks.
  • By implementing AS/ NZS 4801:2001 Occupational Health and Safety Management Systems – Requirements guaranteed stakeholder confidence in safety processes and controls.
  • High-level technical specification document preparation and planning.
  • Additional site anchoring solutions were provided to ensure safe access.
  • Implement high-level public safety systems to ensure our work could be carried out with no danger to imminent traffic in the area.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“The Sky5 team took just 10 days to complete the works, without any incidents. The client feedback was the professionalism and efficiency of the Sky5 team exceeded expectations.”

Greensborough Shopping Centre

GREENSBOROUGH, VICTORIA
18/08/2014 – 18/10/2014

Sky5, working in collaboration with height safety equipment supplier Sayfa Systems were engaged to undertake a major overhaul of the existing access systems used to maintain the glass atriums at Greensborough Plaza Shopping in Melbourne’s northern suburbs.

540m

OF GUARDRAIL
INSTALLED

210sqm

FALL ARREST
NETTING

6

TOWERS
INSTALLED

SKY5, WORKING IN COLLABORATION WITH HEIGHT SAFETY EQUIPMENT SUPPLIER SAYFA SYSTEMS

Challenges

  • The existing fall arrest system required workers to have a high degree competency and required ongoing maintenance and annual certification.
  • The new systems had to be integrated into the pre-existing access walkways.
  • Working adjacent to brittle and fragile surfaces during the installation process.
  • The movement of materials from delivery vehicles to the required locations on the roof.
  • Working under an extremely tight deadline while trying to ensure the least disruption possible to the busy centre.
  • Working with the many various cured roof sections across the shopping centre.

Solutions

  • A specially designed guardrail system was designed to be retro-fitted to the pre-existing walkway to provide safe access to the many glass atriums throughout the centre.
  • Removal of the fall arrest system greatly reduced on-going certification and maintenance costs.
  • By using a custom designed fall protection net we removed the risk of falls through the glass atriums during the installation process.
  • The newly installed guardrail system requires less user competency, thus enabling workers to easily access problem areas much more quickly, efficiently and safely than in the past.
  • Pre-zoning of the roof areas to enable accurate labelling of the material packs, ensuring the materials were correctly placed over the roof area.
  • By using a small Tele-handler to off load materials allowed us to safely and effectively navigate the numerous multi-level car parks.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“Due to the nature of the building, exacting measurements were required to cater to the unique and varying curved roof line. Along with the difficult and dangerous access requirements in and around the site, the project presented a huge challenge. However, Sky5 working closely with our suppliers and logistic companies were able to deliver the project on-time and on-budget.”

Erina Fair Shopping Centre

ERINA FAIR
01/06/2014 – 01/06/2016

Lend Lease engaged Sky5 for a Major Roof Safety upgrade in 2014. Due to the scale of the requirements and number of roofs and volume of materials the project was split into 3 phases, to be scheduled over 2 years, with completion due mid 2016.

2000m

OF GUARDRAIL
INSTALLED

2500m

OF WALKWAY
INSTALLED

5400hrs

INCIDENT
FREE 

SKY5 WERE ABLE TO PROVIDE EXCEPTIONAL SERVICE AND QUALITY WITHIN THE FINANCIAL BUDGET, TIMELINE AND WITH ALL RESPECT TO THE MAJOR CLIENTS TENANTS AND ACTIVITIES.

Challenges

  • Site Safety controls as Principal Contractor undertaking High Risk construction activity.
  • Our work teams had to scale up and down in size frequently.
  • Designing access to Cooling Towers was required as nothing existed to date.
  • Rigorous Workplace Health & Safety (WHS) reporting requirements.
  • Independent Quality Assurance processes needed to be developed and documented.
  • Significant amount of time and resources working near or on fall edges installing guardrail.
  • Liaison with over 15 Retail tenancies was required for crane and materials movements.

Solutions

  • Our Solutions involved its own unique extranet portal to engage stakeholders with real-time updates inline with requirements of AS 4801 Accreditation in Occupational Health and Safety Management Systems.
  • Daily news feed ensured Stakeholders up to date with progress.
  • Extranet portal facilitated all site record keeping and documentation in a simple to use format that notified all parties of progress.
  • Anchor capping system – first of its kind within the Australian Fall Prevention industry.
  • Unique methods of using temporary 2 – person rated lifelines was used, attached to permanent anchoring systems that were later capped to ensure that the risk of an unauthorised users was removed.
  • Sayfa Systems (manufacturer) conducted a detailed Quality Assurance program with 100%  compliance.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“The unique solutions applied by the team at Sky5 ensured all aspects of quality and safety were exceeded with all Stakeholders from Centre management, Regional EHS and Divisional teams and service contractors reporting an improved safety level in place when working at heights. The design and control measures have reduced risk, and the contractors requirements, ultimately now at Erina Fair working on roofs is simpler and safer at such a large and complex site.”

East Village

ZETLAND
01/08/2014 – 03/08/2014

Sky5 were engaged to design and construct an access and fall prevention system for 206 residential apartments situated around a distinctive Sky Park in Zetland by Dasco Australia Pty Ltd.

560

ANCHOR
SYSTEMS

450

NUMBER
OF HOURS

95

INCIDENT
FREE DAYS

THE PROJECT COVERED A FOOTPRINT OF 15,000 SQUARE METRES WITH A SKYPARK BUILT WITHIN. THE COMPLEX IS THE LARGEST OF ITS TYPE IN THE SOUTHERN HEMISPHERE.

Challenges

  • Safe access needed to be provided to workers throughout the landscaped gardens.
  • Extra care needed to be taken with Centre piece atrium glass roof and mirrored skylights.
  • Working with architects and designers ensuring functionality and practicality.
  • Multiple system requirements for rope access and fall prevention.
  • Large scale project with tight construction deadlines and multiple activities.
  • Extensive list of value add requirements.

Solutions

  • All systems fixings cast-in, improving safety and performance of rope access systems, providing cost savings to the ongoing maintenance of the systems. Systems require 5 year detailed inspection requirements as per AS1891 and AS4488 not annually providing a reduction in going maintenance costs.
  • Mechanical fixings and through bolted anchors throughout atrium glass structure.
  • Engineered custom bollards for landscaping areas cast in to slab, allowing for 400mm of soil, these multi-directional system allow or fall prevention and rope access use.
  • Construction project manager assigned dedicated to schedule.
  • Unique dual purpose anchoring system cast-in on residential towers roof areas, for immediate use by construction, providing workers with an engineered solution during construction.
  • Methodically tick off all value add requirements and live updates with stakeholders.

DELIVERING OUTCOMES OF THE HIGHEST STANDARD

“The team, effectively delivered the multifaceted project that challenged the Construction division with significant cost savings to the ongoing owners of the project. Sky5’s unique cast-in anchoring solutions will save the owners over 60k over the lifecycle of the property.”