Case Study
Meriton Tower
Client
Karimbla Construction
Problem
Difficult Access to Meriton’s 59 Storey Tower to overhang areas that required framing & caulking to windows to be installed
Solution
A team of rope access technicians using the installed aiding routes to enable access to the overhang areas & winter gardens to penthouse areas measured cut & installed the framing & caulking to windows in these difficult access areas
Skills needed to complete the task
Rope Access level 3 & 2
Aiding techniques
Hauling & lowering
Advanced Anchor Rigging